![Ιμqεw zwΘEεw@zwκU](../../imageN/top_EN.jpg) |
|
Graduate School Master grade 1
Integrated Design Studio I I |
|
In Integrated Design Studio II students build full-scale models and tackle relevant assignments on structures, building construction methods, and materials for those models. In the first assignment of Integrated Design Studio II, gPaper Tube House and Settlementh.In the second assignment of Integrated Design Studio II, gTea-ceremony room made of bambooh. |
>>Integrated Design Studio I |
Masters, first year. Second semester, 2010
|
Integrated Design Studio II
"Tea-ceremony room made of bamboo"
The 6th weeks![V](../../img/new.gif) |
November 30th, December 2nd, 3rd, 2010
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101203IMG_2920.jpg) |
Making a roof |
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101203IMG_2966a.jpg) |
Setting up paper screen door frames
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101203DSC07794.jpg) |
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101203IMG_0347.jpg) |
Tea ceremony room was named "Chikuyouin" |
|
Garden view from the tea ceremony room |
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101203IMG_3121.jpg) |
Night View
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101203IMG_3095a.jpg) |
Photograph in front of the Tea ceremony room
|
|
|
|
Masters, first year. Second semester, 2010
|
Integrated Design Studio II
"Tea-ceremony room made of bamboo"
The 5th weeks |
November 25th, 26th, 2010
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101126IMG_2754.jpg) |
Craning the roof framing |
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101126IMG_2774.jpg) |
Setting up the roof framing on the pillar units
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101126IMG_2846.jpg) |
Making a paper screen door frame
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101126IMG_2783a.jpg) |
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101126IMG_2847a.jpg) |
Making a roof with gyoshizuh, or reed screens |
|
Checking where eaves boards are attached |
|
|
|
|
Masters, first year. Second semester, 2010
|
Integrated Design Studio II
"Tea-ceremony room made of bamboo"
The 4th weeks |
November 16th,18th,19th, 2010
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101119IMG_2564a.jpg) |
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101119IMG_2555a.jpg) |
Checking whether a pillar is straight |
|
Putting in a mock-up of gshojih, or paper screen door |
|
|
![zwΘ3NΆ zέvKIII](image10D_M1_II/101119IMG_2568a.jpg) |
Making a roof framing with bamboo |
|
![zwΘ3NΆ zέvKIII](image10D_M1_II/101119IMG_2561a.jpg) |
Putting in "tatami", or straw mats |
|
|
Masters, first year. Second semester, 2010
|
Integrated Design Studio II "Tea-ceremony room made of bamboo"
The 2nd and 3rd weeks |
November 4th,9th,11th,12th, 2010
|
|
![zwΘ3NΆ zέvKIII](image10D_M1_II/101112IMG_2058.jpg) |
Studying how to attach bamboo pillars and how to resist the horizontal force |
|
Sawing bamboo in a prescribed length to make a pillar
|
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101112IMG_2348.jpg) |
|
|
Fixing pillar units in the prescribed positions |
|
|
![zwΘ3NΆ zέvKIII](image10D_M1_II/101112IMG_2369.jpg) |
Studying how to make a roof framing, thinking about the roof inclination, the pitch of rafters, the relationship between eaves and verges |
|
![zwΘ3NΆ zέvKIII](image10D_M1_II/101112IMG_2361.jpg) |
Attaching top plates on pillar units temporarily to check and see the created space |
|
|
Masters, first year. Second semester, 2010
|
Integrated Design Studio II "Tea-ceremony room made of bamboo"
The first week |
October 26th,28th,29th, 2010
|
|
![zwΘ3NΆ zέvKIII](image10D_M1_II/101029IMG_2021.jpg) |
Studying how to attach bamboo pillars and how to resist the horizontal force |
|
![zwΘ3NΆ zέvKIII](image10D_M1_II/101029IMG_2020.jpg) |
Studying how members are joined using a mock-up of roof framing |
|
![zwΘ3NΆ zέvKIII](image10D_M1_II/101029DSC01313.jpg) |
A mock-up of gshojih, or paper screen door |
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101029IMG_1950.jpg) |
|
![zwΘ3NΆ
tB[h[N:2008N412ϊ(y)](image10D_M1_II/101029IMG_1965.jpg) |
Marking the floor to lay the foundation; Students were able to determine the location of the foundation without any mistakes.
|
|
Laying wooden blocks used as the foundation |
|
|
|
|
|
>>TOP |
Copyright 2005-2010 Mukogawa Mowen's University.All rights reserved.
|