|
|
Graduate School Master grade 1
Integrated Design Studio I I |
|
In Integrated Design Studio II students build full-scale models and tackle relevant assignments on structures, building construction methods, and materials for those models. In the first assignment of Integrated Design Studio II, gPaper Tube House and Settlementh.In the second assignment of Integrated Design Studio II, gTea-ceremony room made of bambooh. |
>>Integrated Design Studio I |
Masters, first year. Second semester, 2010
|
Integrated Design Studio II
"Tea-ceremony room made of bamboo"
The 6th weeks |
November 30th, December 2nd, 3rd, 2010
|
|
|
Making a roof |
|
|
Setting up paper screen door frames
|
|
|
|
|
Tea ceremony room was named "Chikuyouin" |
|
Garden view from the tea ceremony room |
|
|
|
Night View
|
|
|
Photograph in front of the Tea ceremony room
|
|
|
|
Masters, first year. Second semester, 2010
|
Integrated Design Studio II
"Tea-ceremony room made of bamboo"
The 5th weeks |
November 25th, 26th, 2010
|
|
|
Craning the roof framing |
|
|
Setting up the roof framing on the pillar units
|
|
|
Making a paper screen door frame
|
|
|
|
|
Making a roof with gyoshizuh, or reed screens |
|
Checking where eaves boards are attached |
|
|
|
|
Masters, first year. Second semester, 2010
|
Integrated Design Studio II
"Tea-ceremony room made of bamboo"
The 4th weeks |
November 16th,18th,19th, 2010
|
|
|
|
|
Checking whether a pillar is straight |
|
Putting in a mock-up of gshojih, or paper screen door |
|
|
|
Making a roof framing with bamboo |
|
|
Putting in "tatami", or straw mats |
|
|
Masters, first year. Second semester, 2010
|
Integrated Design Studio II "Tea-ceremony room made of bamboo"
The 2nd and 3rd weeks |
November 4th,9th,11th,12th, 2010
|
|
|
Studying how to attach bamboo pillars and how to resist the horizontal force |
|
Sawing bamboo in a prescribed length to make a pillar
|
|
|
|
|
Fixing pillar units in the prescribed positions |
|
|
|
Studying how to make a roof framing, thinking about the roof inclination, the pitch of rafters, the relationship between eaves and verges |
|
|
Attaching top plates on pillar units temporarily to check and see the created space |
|
|
Masters, first year. Second semester, 2010
|
Integrated Design Studio II "Tea-ceremony room made of bamboo"
The first week |
October 26th,28th,29th, 2010
|
|
|
Studying how to attach bamboo pillars and how to resist the horizontal force |
|
|
Studying how members are joined using a mock-up of roof framing |
|
|
A mock-up of gshojih, or paper screen door |
|
|
|
|
Marking the floor to lay the foundation; Students were able to determine the location of the foundation without any mistakes.
|
|
Laying wooden blocks used as the foundation |
|
|
|
|
|
>>TOP |
Copyright 2005-2010 Mukogawa Mowen's University.All rights reserved.
|